[IPOL discuss] planned downtime for www.ipol.im

Nicolas Limare nicolas.limare at cmla.ens-cachan.fr
Thu Jan 26 17:23:36 CET 2012


Hi,

A major system upgrade is planned for this week-end on the main IPOL
web server. During this time, http://www.ipol.im/ and
https://edit.ipol.im/ will be unavailable and replaced by a temporary
page.

I intend to start the operation sunday 10:00, Nagoya time (sunday 02:00
Paris time, saturday 23:00 Montevideo time). If everything goes
perfectly fine it will be done in one hour, but this kind of upgrade
never goes perfectly fine, so you should expect IPOL to be unavailable
all Sunday.

The web site, article edition interface and demos will not be usable
during this interruption. The development server (fuchsia/dev.ipol.im)
will not be affected.

If there is something VERY important you MUST do this week-end on
www.ipol.im, let me know, I can postpone the upgrade.

-- 
Nicolas LIMARE - CMLA - ENS Cachan    http://www.cmla.ens-cachan.fr/~limare/
IPOL - image processing on line                          http://www.ipol.im/
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 198 bytes
Desc: Digital signature
URL: <http://tools.ipol.im/mailman/archive/discuss/attachments/20120127/301477a5/attachment.pgp>


More information about the discuss mailing list